Knaggs Construction was the works contractor to complete the upgrade and relevelling of the Warehouse North Island Distribution Centre (NIDC) container yard.
- Work in a high profile and high quality expectation environment
- Work in a high-volume live facility
- Concrete yard demolition
- Railway track removal
- Stormwater system reconstruction
- High-volume milling and asphalt resurfacing (up to 600t of asphalt paving per shift, asphalt layerworks up to 400mm deep).
- Asphalt surfacing at close to 1% grades and final levels all within 2mm of design levels with zero ponding
- Finishing works and linemarking