The Warehouse NIDC Yard

Knaggs Construction was the works contractor to complete the upgrade and relevelling of the Warehouse North Island Distribution Centre (NIDC) container yard.

  • Work in a high profile and high quality expectation environment
  • Work in a high-volume live facility
  • Concrete yard demolition
  • Railway track removal
  • Stormwater system reconstruction
  • High-volume milling and asphalt resurfacing (up to 600t of asphalt paving per shift, asphalt layerworks up to 400mm deep).
  • Asphalt surfacing at close to 1% grades and final levels all within 2mm of design levels with zero ponding
  • Finishing works and linemarking