Knaggs Construction was Earthworks and Civil contractor to complete new 30,000m2 manufacturing, offices and annex buildings to the existing Fisher and Paykel Healthcare Highbrook campus.
- Sediment & erosion control
- Bulk earthworks
- Detail earthworks
- Footing excavation and backfill
- Retaining wall backfill
- Drainage
- Slab-on-grade prep
- Services trenching and backfill
- Wastewater drainage
- Wetland construction
- Wastewater pump station
- External hardstands
- Asphalt pavements
- Stormwater drainage
- Stormwater retention pond
- Earthworks landscape features
- Kerbing
- Concrete pavement prep
- Asphalt road and carpark construction