Latest Projects
Hillside Park – Papatoetoe
Reconstruction of existing carpark including drainage and fencing.
Scope
Earthworks, drainage, kerbing, service ducting, asphalt works, concrete works, fencing, line marking, and signage.
Challenges overcome
No difficulties.
Ngati Otara Park – Netball Court Extension
Construction Reconstruction & Extension of the Netball & Basketball Courts.
Scope
Earthworks, layer works, drainage, service ducting, kerbing, asphalt works, concrete works, line marking, line marking removal, fencing, signage, and street furniture.
Challenges overcome
Finished product exceeding client’s expectations. Zero ponding on a surface grade of 0.5%. Site safety was kept to a high standard while working beside the school and on very busy public sports grounds. Operating during school hours. Site Controls (Dust, Noise).
Cascades Walkway
Construction Works of Footpath Widening and Retaining Wall.
Scope
Earthworks, structural work, retaining wall, landscaping, street furniture, concrete works, arborists works.
Challenges overcome
Progress was hindered due to the poor weather during the construction. We persisted and achieved a good result for the client. The successful construction of a path requiring heavy vehicle access on extremely soft subgrade within the long narrow site. Construction site adjacent to waterway causing heavy flooding to the site during periods of rainfall. Engineering solutions for access over extremely shallow services. Operating during school hours. Finished product exceeding client expectations. Site safety was kept to a high standard and zero non-conformances. Restricted public access through the site.
Royal Auckland and Grange Golf Course – Driving Range Access
Private road construction to the members’ driving range.
Scope
Drainage, pavement construction, kerb and channel, asphalt.
Challenges overcome
High profile. Operating in a popular members-area.
TWG Distribution Centre – Straddle Crane Yard Re-level
Reconstruction of asphalt container yard to 2mm tolerance.
Scope
Train-track demolition, pavement construction, drainage, polymer asphalt, and line marking.
Challenges overcome
Staged program with tight deadlines. Working amongst live operations. High material volumes. Tight tolerance.
Mainfreight Whangerei – Enabling Package 1
Construction of a secure container hardstand.
Scope
Bulk earthworks, concrete works, kerbing, pavement construction, fencing.
Challenges overcome
Tight deadlines and high material volumes.
Bunnings Westgate – Enabling Package
Construction of enabling works.
Scope
Bulk earthworks, sediment & erosion control.
Challenges overcome
Tight deadlines. High material volumes.
AIAL Park'n'Ride
– Extension Area B
Construction of the Park n Ride Extension Area B.
Scope
Bulk earthworks, concrete works, carpark construction, road construction, drainage, services, footings, signage, fencing, line-marking, and landscaping.
Challenges overcome
Tight deadlines. Complex layout with a high volume of drainage and services.