Knaggs Construction was principle contractor to construct retrofitted perimeter channel drainage to address surface flooding at the DHL office at Auckland Airport.
- High-profile works location
- Detail earthworks
- Stormwater connections
- Aesthetic and functional channel drain and concrete apron